NF Nooksack Wildcat Reach Feasibility and Design
#09-NIT-RCO1682 #09-NIT-RCO1682
Organization WRIA 1 Salmon Recovery Board (LE)
Status Completed
Schedule Start Date: 3/15/2010 End Date: 1/31/2012
Priority 1
Category Category: Non-Capital Projects
Project Photo
DESCRIPTION
The North Fork/Middle Fork early Chinook population is considered essential for ESU recovery, but population productivity is substantially less than that needed to sustain and recover the population. A recent assessment and restoration planning report identified limiting habitat factors and causes of habitat degradation and recommended specific restoration strategies by reach. The Wildcat reach of the North Fork Nooksack River (RM 53.3-54.8) is one of two project reaches among 14 reaches that scored highest in terms of restoration potential in the North Fork Nooksack River. This project will advance the development of instream projects throughout the Wildcat Reach that will restore historic channel planform, habitat diversity, and habitat functions, including stable spawning and rearing habitats for NF/MF Nooksack early chinook. Specific tasks completed include: (1) feasibility study, including refinement of limiting factors and reach-specific objectives, identification and evaluation of various alternatives, landowner outreach, and selection and staging of the preferred alternative; (2) preliminary (30%) design for the reach-scale preferred alternative, including flood risk assessment, design report, and cost estimates; and (3) final design and premits for the 1st project phase. Potential treatments range from stabilization/augmentation of existing wood accumulations to historic-scale engineered log jams, although existing wood loading in the reach is low.
Show more  ↓
GOAL
The goal of the project is to increase/improve information to help select projects that have a high certainty and benefit. The objective of the project is to determine project siting, feasibility, design, or implementation. Measure: Design
Goal: 1 Each  Actual: 1 Each
FUNDING
Project Cost
$117,650
Proposed Funds $0
Allocated Funds $117,802
Expended Funds $117,802
Balance $0
FUNDING INSTRUMENTS
FUNDING SOURCES
PROJECT CONTACT
SPONSOR
PHOTOS

 
LOCATION
Congressional Districts:1
US WA WRIA:1 Nooksack
Legislative Districts:42
Puget Sound Process Units:Delta NKS
Steelhead PCH:High
USGS Level 5 Hydro Regions:Lower North Fork Nooksack River
ESA Listed Salmon/Steelhead Status:Not Warranted
ESA Listed Salmon/Steelhead DPS/ESU:Odd Year Pink Salmon - Not Warranted
Bulltrout Management Unit:Puget Sound
ESA Listed Salmon/Steelhead DPS/ESU:Puget Sound Steelhead - Threatened
ESA Listed Salmon/Steelhead DPS/ESU:Puget Sound\Strait of Georgia Coho Salmo
USGS Level 6 Hydro Regions:Racehorse Creek
PSP Action Areas:San Juan Islands
ESA Listed Salmon/Steelhead Status:Species of Concern
US WA Township:T40-0N R6-0E S34
ESA Listed Salmon/Steelhead Status:Threatened
View project on a larger map

Related Projects

OTHER
Design 01 Each
ADDITIONAL INFORMATION