South Fork Nooksack at Hardscrabble ELJ Design
#09-NIT-RCO1683 #09-NIT-RCO1683
Organization WRIA 1 Salmon Recovery Board (LE)
Status Completed
Schedule Start Date: 12/10/2009 End Date: 3/22/2012
Priority 1
Category Category: Non-Capital Projects
DESCRIPTION
The South Fork Nooksack (SFN) early Chinook population is considered essential for ESU recovery, but abundances are critically low and immediate action is necessary to ensure population persistence.  A recent reach assessment and restoration planning effort identified limiting factors and causes of habitat degradation and recommended specific restoration strategies and locations.  This project has advanced project implementation - specifically, developed a conceptual design and sequencing for the optimal restoration scenario for the reach, and developed construction-ready designs, conducted flood risk analysis, and will prepare permits for phase 1 construction of engineered log jams in the South Fork Nooksack Hardscrabble Creek Reach (~RM 5.1-5.4).  Log jams were designed to address factors most limiting SFN early Chinook in the reach, including low habitat diversity and lack of deep holding pools with cover.  Conceptual design was funded by the Puget Sound Partnership through funds identified to advance design of high priority projects in the basin.  Structures presented in the conceptual designs are similar to those constructed in the Todd Creek reach downstream in summer 2008; those structures have been successful at promoting scour and formation of deep, thermally stratified pools.
Show more  ↓
GOAL
The goal of the project is to increase/improve information to help select projects that have a high certainty and benefit. The objective of the project is to determine project siting, feasibility, design, or implementation.
Goal: 0   Actual: 0  Notes: design and feasibility
FUNDING
Project Cost
$57,600
Proposed Funds $0
Allocated Funds $51,279
Expended Funds $51,279
Balance $0
FUNDING SOURCE
SRFB - Salmon Recovery Funding Board$51,279
FUNDING INSTRUMENTS
FUNDING SOURCES
PROJECT CONTACT
SPONSOR
PHOTOS

 
LOCATION
Congressional Districts:1
US WA WRIA:1 Nooksack
Legislative Districts:42
Puget Sound Process Units:Delta NKS
Steelhead PCH:High
USGS Level 6 Hydro Regions:Lower South Fork Nooksack River
ESA Listed Salmon/Steelhead Status:Not Warranted
ESA Listed Salmon/Steelhead DPS/ESU:Odd Year Pink Salmon - Not Warranted
Bulltrout Management Unit:Puget Sound
ESA Listed Salmon/Steelhead DPS/ESU:Puget Sound Steelhead - Threatened
ESA Listed Salmon/Steelhead DPS/ESU:Puget Sound\Strait of Georgia Coho Salmo
PSP Action Areas:San Juan Islands
USGS Level 5 Hydro Regions:South Fork Nooksack River
ESA Listed Salmon/Steelhead Status:Species of Concern
US WA Township:T38-0N R5-0E S30
ESA Listed Salmon/Steelhead Status:Threatened
US WA Counties:Whatcom
View project on a larger map

Related Projects

ADDITIONAL INFORMATION